Building Permits are required for any kitchen or bathroom remodels, and must be obtained before any construction, alteration, or addition work begins. If your remodel project is NOT for a house or duplex, separate Mechanical, Electrical or Plumbing (MEP) permits are also required.
Please note that different application requirements and processes apply to the following:
- Remodels with NO window or wall layout changes
- Remodels with window replacement, but NO changes to wall layout or window size
- Remodels WITH changes to wall layout or to window size
See the "How to Apply" section below for full details and procedures.